Dumpster permit in Arlington, TX

In Arlington, you don't need a permit for a dumpster on your own driveway. The city doesn't publish a rule specifically for dumpsters on the street, so before placing one on a street, sidewalk, or other right-of-way, ask Arlington Public Works whether a right-of-way permit is needed. Cities that publish a rule generally require one.

Issued by
Arlington Public Works
Typical fee
$50 (traffic-control plan)
Processing
3 business days
Phone
Contact city hall

How to get one

  1. Decide where the container goes

    A driveway or private lot avoids the city permit in Arlington. If the only spot is the street, measure: a 20-yard needs about 25 feet of curb length and 10 feet of width.

  2. Contact Arlington Public Works

    Use the city's website to request a right-of-way or encroachment permit. Ask for the current fee, which usually runs $50 (traffic-control plan).

  3. Have the details ready

    Expect to give the address, the container size, the delivery and pickup dates, the hauler’s name, and sometimes a placement sketch or proof of the hauler’s insurance.

  4. Leave time for approval

    Plan on 3 business days. Book the delivery for after the permit is issued, and keep a copy on site.

  5. Check HOA rules too

    Many Arlington neighborhoods with HOAs limit how long a container can sit, even on a driveway. The city permit doesn't override HOA rules.

Arlington permit questions

Do I need a permit for a dumpster in Arlington, TX?

Not on your own driveway. Arlington doesn't publish a rule specifically for dumpsters on the street, so before placing one on a street or sidewalk, ask Arlington Public Works whether a right-of-way permit is needed. Cities that publish a rule generally require one. HOA rules may also apply.

How long can I keep a rental dumpster in Arlington?

Many haulers include about a week in the base price and charge a daily fee after that, so ask for the extra-day rate when you compare quotes. If the dumpster is on the street under a permit, the permit's end date is the limit.